[1]
Duy, N.V.A. and Thai, N.L. 2018. Optimal Job Scheduling of Multiple Rail Cranes in Rail Stations. RA Journal Of Applied Research. 4, 06 (Jun. 2018), 1739–1745. DOI:https://doi.org/10.31142/rajar/v4i6.05.